Bell & Webster

Regeneration Tue, Mar 22, 2016 5:33 PM

Bell & Webster

FP McCann has recently strengthened its structural building precast concrete arm with the acquisition of Bell & Webster formerly part of the Eleco group of companies. Based in Grantham Lincolnshire, the well-established market leader in design, manufacture and build, is renown for its range of bespoke concrete products used on large scale construction projects from hotels, military, custodial and student accommodation, to football stadia, conference centres and multi-screen cinemas.

The proprietary 'RoomSolution™' system, takes precast concrete units which link together to form a Crosswall construction, a now common method of build, first introduced into the UK in the early 1990's. Precast concrete wall panels are formed to suit design requirements. Most window & door openings can be accommodated, as can other wall penetrations by design.  Off-site modular building structures including internal walls, floors and ceilings, are manufactured to a high quality finish which are suitable for direct decoration with minimal preparatory work. No plaster finishes are required. All horizontal and vertical sections are designed for ease of build, linking  together with hidden tie rods and joints are finished with a high-strength non-shrink grout, fully conforming with Building Regulations.

Significant first fix time savings combined with the quality fair-faced finish to the walls, results in major cost benefits from early completion. The 'just-in-time' manufactured and delivered precast concrete 'RoomSolution™' reduces wet trades and second fix trades benefit from cast-in electrical conduit, door and window frames. The experienced design team, works with the customer to ensure the modular room dimensions and build criteria match the client's specifications. The 'RoomSolution™' system also offers excellent acoustic and thermal mass properties.

Typically,  a 32 bed, shared4 kitchen  block, including central core & stairs with fitted bathroom pods takes approximately 2 weeks to build.

In hotel construction, Bell & Webster have built some 50 Holiday Inn Express hotels, totalling 5300 rooms and  also projects for Ramada, DeVere, Travelodge, Ibis and Radisson. Currently a new Mercure Hotel in Edinburgh is under construction.

To date, over 35,000 precast concrete rooms have been manufactured by Bell & Webster and erected on a variety of projects with one of the most prestigious being the 788 room University of East London campus at Royal Albert Docks. 28 student accommodation projects have been completed nationwide providing 18,000 room solutions. On-going contracts are at Newcastle University for Northern Developments  and New Buckinghamshire University with Galliford Try.

Construction is also well underway on the 457 student room accommodation project for the phase 3 development at Reading University. The £22 million project consists of five  four storey blocks, four of which will utilise the 'RoomSolution™' system.  The Bell & Webster design team have developed and implemented some process improvements evolved from phases 1and 2.

http://constructionvideos.co.uk/video/GUO14YOKOUXR/FP-McCann-Case-Study-Reading-University-Student-Accommodation

For all 'RoomSolution' enquiries contact Bell and Webster (an FP McCann company) on 01476 562277. www.fpmccann.co.uk

 

Featured News

Specification news
ROCKWOOL NyRock Rainscreen 032 delivers certified...

As extreme weather events are projected to become more frequent due to climate...

Read More >>

Specification news
Light throughout – divide space with glass Skyfold...

Companies looking to divide room space while maximising light should consider the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>