Balfour Beatty awarded £25m primary schools contract

Public Sector Tue, Mar 22, 2016 5:36 PM

Balfour Beatty awarded £25m primary schools contract

Balfour Beatty has been awarded a £25 million contract to extend and upgrade six primary schools  for the London Borough of Merton as part of the £1 billion, four year iESE (Improvement and Efficiency South East) framework.

The contract includes a £5.1 million three-storey extension to Pelham Primary School; a £4.4 million new school hall, main entrance and teaching block at Hillcross primary school; a £4 million extension, including a new hall and teaching block, at Poplar Primary School;  a £2.7 million teaching block, library extension and link at St Mary’s Catholic Primary School; a £3.9 million new teaching block at Singlegate Primary School and a new £1.6 million two-storey teaching block at Merton Abbey School.

The six school contract is the latest to result from Balfour Beatty’s appointment to the iESE framework in 2011, through which the company has been awarded in excess of £100 million worth of work, including two recently completed primary schools in Winchester in Hampshire.

Much of the work is on school buildings dating back to the 1930s and will incorporate updates to the latest energy efficiency standards, including innovations such as photovoltaic panels and low energy lighting.

Nick Kent, Balfour Beatty iESE Senior Contract Manager, said: “These six school projects for Merton Council further strengthen our position as a leading construction partner in the education sector and build on our good working relationship with the London Borough of Merton.”

The schools projects are scheduled for completion in September 2015.

Featured News

Specification news
Reynaers adds new panic hardware to Vision 7

Reynaers Aluminium has added new panic hardware options to its Vision 7 Thermal...

Read More >>

Specification news
Forbo evolves its sustainability credentials with new...

With sustainability one of the core values at Forbo Flooring Systems, the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>