Architect Specifies Lonza Wood Protection’s TANALITH E Preservative for Innovative Timber Home on Lake in The Netherlands

Latest News Tue, Mar 22, 2016 5:01 PM

Architect Specifies Lonza Wood Protection’s TANALITH E Preservative for Innovative Timber Home on Lake in The Netherlands

Lonza Wood Protection’s TANALITH E wood preservative has been used to treat and protect the wood frame supporting an innovative and striking timber house, known as Daylighthouse 2, in a scenic lakeside location in The Netherlands.

TANALISED E pressure-treated timber can be specified for both in and out of ground contact applications where there is a medium to high risk of decay or insect attack. It provides effective long-term protection against fungal and insect attack and has proven performance.

The house was designed as a perfect cube of nine by nine by nine metres by a team from Mirck Architecture, led by Sander Mirck, who explains, “We chose the TANALISED E WaxedWood with a built-in water repellent because it carries a 30-year warranty, and has the best color, strength and texture for the project; we needed a wood that we could use for load-bearing parts of the building as well as for the facade.”

Daylighthouse 2 is an open-plan house with three split-level floors. The timber frame, made of FSC certified larch TANALISED E WaxedWood from Foreco of Dalfsen, was prefabricated to cut the time needed to construct the house. The treated frame supports, wooden cladding and joinery are also made from TANALISED E WaxedWood, and the ceilings of untreated okoumé (gaboon) wood. The white-painted window frames are meranti, an Asian hardwood.

Located on the shores of Ijsselmeer, the largest artificial lake in Western Europe, Daylighthouse 2 overlooks a marsh populated with wild birds. The architect designed the house to blend into the local environment and to make the most of the natural light, including large windows, a full glass facade on the south-west side of the ground floor and a glass-roofed ‘winter garden.’ The roof terrace has amazing views across the lake and over to Amsterdam and Marken. The project was constructed by Bouwbedrijf Jadi, based in Genemuiden, and took around a year to build, at an overall cost of about €230,000.

Featured News

Specification news
BCO warns sustainability gap risks regional offices...

A stark regional imbalance in the proportion of highly sustainable office buildings...

Read More >>

Specification news
Great start made at Great Haddon Primary School

Morgan Sindall Construction’s Cambridgeshire business has broken ground at a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Roofing Collections
Roofing Collections

Our carefully curated range of handmade roofing tiles and slates is specifically designed to...

Read More >>

Special Brick Collections
Special Brick Collections

Special-shaped bricks are specifically designed to feature a variety of shapes and dimensions that...

Read More >>

Brick Slips
Brick Slips

Brick slips manufactured from genuine clay bricks are available in rustic, traditional, and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>

Reclaimed Brick Display at Reclamation Yard
Reclaimed Brick Display at Reclamation Yard

Reclaimed Brick Display at Reclamation Yard

Watch Now >>