ADT updates fire safety systems at school

Latest News Tue, Mar 22, 2016 5:06 PM

St Mary's School, an Independent girls’ school in Dorset, has successfully updated all its fire detection measures with design help and guidance from ADT Fire & Security.

The upgrade will ensure the site is protected by a reliable and robust digital system. St Mary’s School in Shaftesbury educates boarding and day pupils from the ages of 11-18.

The school occupies a varied 55 acre estate centred around a large 4 floor Victorian country house, now enhanced by a modern complex of bespoke buildings including a sports hall, swimming pool, and music school as well as classrooms, a library and the stand-alone sixth Form House.

The school’s management and Bursar’s office sought guidance from ADT Fire & Security in the confidence that the respected manufacturer would be able to assist them with achieving a seamless upgrade. Following extensive consultation, and a satisfactory design solution being arrived at, the contract was awarded to Bristol based DIAL Electrical Services Ltd.

The new digital MZX system installed within the teaching, residential and other areas of St Mary’s is very much purpose designed to the establishment’s needs: featuring a total of 5 networked control panels. There are 3 in the main building, with a repeater panel in the area of the Bursar’s office, plus further control panels in the separate Sixth Form House and indoor swimming pool. As well as the ubiquitous break-glass alarms, the system makes use of ADT Fire & Security’s combined heat and smoke detectors.

ADT’s Technical Representative on the project, Adam Davison, comments: “This is a Class L1 system, offering automatic smoke detection across all parts of the building; while there are also a large number of CO (carbon monoxide) detectors throughout the accommodation areas.

“We worked closely with the school and the specialist electrical contractor, DIAL, in order to minimise disruption to the life of the school. For although changing from the original Minerva, analogue system to a digital one in the MZX system, does not automatically require new wiring, St Mary’s had almost all old M1 copper cabling, which was overdue for replacement. The new digital system offers easy install and straightforward commissioning, meaning the work went very well and further phases are pending for the remaining outbuildings.”

The modularity and growth potential of the system to incorporate major new developments was a key requirement. It will enable the school to seamlessly add its new Academic Facility, which is currently under construction and the art and photography complex where building is planned to start in June 2013.

Furthermore, since the completion of the new fire detection and alarm installation, ADT Fire & Security has been providing a quarterly maintenance service to St Mary’s.

Featured News

Specification news
UK construction output declines slightly in June

Construction companies indicated a marginal reduction in total business activity...

Read More >>

Specification news
INCA survey reveals size of the UK EWI industry

INCA, the recognised trade association for the external wall insulation (EWI)...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>