Academy receives traditional looking building in just 11 weeks from Wernick Buildings

Latest News Tue, Mar 22, 2016 5:01 PM

Academy receives traditional looking building in just 11 weeks from Wernick Buildings

Wernick Buildings were selected to build the new classroom facility after a competitive tendering procurement process by the Academy for their rapidly expanding 6th form intake.

Janine Tuck, who is the Facilities Manager at Langley Academy commented: “When I received all the tenders back for the new proposed facility, I was surprised at the speed of which the project could be finished by Wernick Buildings. We are a very busy Academy and minimal disruption to our site is important for all our Students and Staff”.

The newly constructed classroom facility comprises of three individual class rooms which have been designed with the flexibility of being converted into one large assembly room. This is achieved with specially designed fold-away partitions which provide an exceptional 48db sound proof rating. The inside to the facility has a full suspended ceiling grid throughout which is complemented by a high standard of internal finishes and the latest state of the art IT equipment. The facility externally features a visually pleasing finish of real brick and render, which is fully complimented with a 22.5 degree traditional tiled Dutch barn roof which matches the existing neighboring building.

Janine was very happy with the fast track build provided by Wernick. She commented, “Communication with the Wernick team from start to finish was excellent and any issues arising were dealt with promptly, I am totally impressed of how the finished building looks ‘just like a traditional looking building’. Wernick offered a 14 week Programme however; they achieved the whole project in just 11 weeks. Our whole experience of engaging Wernick Buildings to deliver our new facility was exceptional and most importantly for us - on budget”.

At a glance:
Client: Langley Academy, Slough Borough
Facility Requirement: Expanding 6th form Classroom Block
Project type: Educational ‘Full Turnkey Supply’ - Wernick Buildings Ltd (Main Contractor)
Facility consists of: Three Classrooms, Male & Female Toilets, Office, unisex Shower, IT room, Large Achieve store, and substantial circulation corridor.

Featured News

Specification news
A. Proctor Group Collaborates with Park Home...

The introduction of the Building Safety Act 2022 was focused around higher-risk...

Read More >>

Specification news
A. Proctor Group products achieve CCPI assessment

Proctor Group has successfully undertaken assessment of the product information for...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

Vertical Sliding Sash Window Brochure

Vertical Sliding Sas...
By Epwin window systems...

Download Now >>

Two-Part Cill System Brochure

Two-Part Cill System
By Epwin window systems...

Download Now >>

 Spectus Ovolo  Windows and Doors Brochure

Spectus Ovolo Wind...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

A responsible addition: HIMACS shapes are now SCS-Certified for recycled content
A responsible addition: HIMACS shapes are now SCS-Certified for recycled content

HIMACS has long been the solid surface material of choice for architects and designers looking for a...

Watch Now >>

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>