Regeneration Wed, Oct 2, 2024 1:45 PM
External wall insulation specialist Alsecco has introduced technical packs to support early, accurate specification and ensure that information required for the golden thread is in place from the start of a project.
Providing brick slip systems, render and external wall insulation, the manufacturer has taken steps to give stakeholders, especially on high rise projects, the information needed to successfully specify projects at the initial engagement stage.
Pulling together essential information including a U-value calculation for the project, condensation risk analysis, certification, technical and safety data, the packs contain all the information required to demonstrate that Alsecco’s systems meet the design specification – and are compliant with the relevant regulations.
Image: Alsecco's Ecomin 300 was specified on this Boardwalk upgrade in Eastborne.
In addition, the technical team at Alsecco create a suite of drawings for the packs to support the application and installation of the systems, with the option to update and change this on site at a later stage within the design process.
While providing the level of detail needed to demonstrate how the products would perform within the project specification, including thermal efficiency and weather performance, the packs also ensure that the level of detail required to support the golden thread is in place from the start.
Ben Robinson, Technical Manager at Alsecco, said: “The introduction of the Building Safety Act has understandably seen the demand for comprehensive information around all building systems increase rapidly.
“In meeting this need from the outset we aim to take a forward-looking approach that puts in place all the detail that is needed to support the progress of a project through the gateway system, and to provide the detail that will support the golden thread for the lifetime of the building.
“As a manufacturer we are committed to supporting the highest standards in construction and have the digital tools and technical knowledge to offer that to specifiers, architects and contractors as soon as interest has been lodged in a scheme.
“While having the correct certification will be vital for the gateway scheme it is also essential that calculations for U-values are correct and that an accurate condensation risk analysis is in place to inform the correct use of systems to fulfil the criteria, ensure lasting quality in the build and to increase application processing speeds for our valued partners.”
Featured News
A glass rainscreen system manufactured by Sto in four different designs has been used...
Fivemiletown headquartered Paving and Building Products firm, AG, has reinforced its...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London