Balfour Beatty holds clinical simulation days for NHS staff

Regeneration Tue, Mar 22, 2016 5:38 PM

Balfour Beatty holds clinical simulation days for NHS staff

Balfour Beatty, working in collaboration with The North West London Hospitals NHS Trust, has delivered three clinical simulation days in the new A&E department currently under construction at Northwick Park Hospital, Harrow.

These have given staff and stakeholders such as the London ambulance service the opportunity to familiarise themselves with the £21m building before moving in to what will be one of London’s busiest A&E departments.

Over 100 people took part across the three simulation days, including Trust staff, hospital support staff and the emergency services. In addition, a completed treatment room, with clinical equipment and trollies, as well as the ambulance parking site, were included in the simulation events which helped staff to prepare and agree final details to ensure the new department will function effectively.

Balfour Beatty is responsible for the construction of the new A&E department. The pavilion style building will also provide patients with an entrance, waiting area and drop off area with direct and level access to the car park. Enclosed corridors will connect the new building to the main hospital including acute admissions, paediatrics, the intensive treatment unit and operating theatres. A lower level will provide offices, seminar rooms and the main plant room.

Tina Benson, Director of Operations for The North West London Hospitals NHS Trust, said: “The clinical simulation days organised with the help of Balfour Beatty have given our staff a great head start for the opening of the new A&E.  The location of the new A&E will mean that patients have improved access to other emergency services, such as acute assessment, intensive treatment units, operating theatres and wards. For patients with a life-threatening emergency, everything they need will be closer by.”

Robert Bradley, Balfour Beatty Project Manager, said: “We have developed a close working partnership with the Trust during the project. In addition to the successful clinical simulation days, each week, over the last five months, staff  have had an opportunity to tour the site to familiarise themselves with the space. It has been invaluable to all parties to engage with the project, as we work together to deliver a state-of-the-art facility that will benefit the residents of Brent, Harrow and the surrounding areas.”

Construction of the new A&E department at Northwick Park Hospital is scheduled for completion in October 2014.

Featured News

Specification news
ROCKWOOL NyRock Rainscreen 032 delivers certified...

As extreme weather events are projected to become more frequent due to climate...

Read More >>

Specification news
Light throughout – divide space with glass Skyfold...

Companies looking to divide room space while maximising light should consider the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>