Landscape and local centre plans approved for North West Cambridge development

Public Sector Wed, Mar 23, 2016 9:54 AM

Landscape and local centre plans approved for North West Cambridge development

The University of Cambridge’s investment in creating a strong sense of place at the North West Cambridge Development has reached a milestone as proposals for the local centre and landscaping along the Western Edge of the site were approved by the local planning authorities.

Significant amounts of landscaped green open space along the Western Edge, adjacent to the M11, will see extensive planting, pathways and a series of swales and lagoons integrated to create a soft landscape as an amenity for the public to enjoy.  

The Western Edge, designed by Aecom, will be the repository for rainwater in the local area and will contribute to the development’s sustainability ambitions, as well as playing an integral part in the water recycling system on the site, the largest of its kind in the UK.

Plans for the local centre were also approved and include a supermarket, shops, doctors’ surgery, police touchdown and energy centre.  The buildings, designed in partnership between Wilkinson Eyre Architects and Mole Architects, are formed around a market square in the heart of the first phase of the development with hard landscaping in the surrounding streets by Townshends.

Roger Taylor, Project Director of the North West Cambridge Development said: “The local centre and landscaping proposals reflect the quality of the kind of place that we will create.  Both aspects capture slices of city and park life in Cambridge and promote the urban extension that we have always envisaged the development to be.  

"The Western Edge and local centre create natural meeting places where people can come together.  The University’s commitment to these facilities will establish the foundations for a new part of the City of which Cambridge can be proud.”   

Works on the North West Cambridge Development infrastructure will start in 2014 with phased completions from late 2015-16.

Featured News

Specification news
Taylor Lane Timber Frame aids council’s green...

Taylor Lane’s Classic wall system has been used to construct 22 dwellings at Burcot...

Read More >>

Specification news
Full roof system helps council meet sustainability and...

To meet Central Government targets to deliver more affordable housing, like many...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

RAPIDFIT OFF-THE-SHELF CUBICLES
RAPIDFIT OFF-THE-SHELF CUBICLES

RapidFit range offers a quick and efficient solution for commercial washroom projects that require...

Read More >>

Washroom Cubicles
Washroom Cubicles

Washroom Cubicles to meet all needsRearo offers a range of stylish, functional, and durable washroom...

Read More >>

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>