Colas eases congestion with new roundabout

Public Sector Wed, Mar 23, 2016 9:11 AM

Colas eases congestion with new roundabout

Colas is near completion of the new Thornbury Barracks roundabout, which aims to address the significant traffic congestion located on the A647 (at the junction with the B6154) – the principal highway link between Leeds and Bradford, improving journey times, in particular for public transport.

Previous road safety issues have also influenced the scheme. Traffic signals have been placed on the junction, with central running lanes constructed through the previous roundabout.

Michael Holmes – Colas Business Manager Leeds said: "Following a period of Early Contract Involvement (ECI), it was rewarding to be granted the opportunity to deliver the construction of a major pinch point project. The award itself progresses the Leeds Contracting unit to a new level in reference to the scheme discipline and project value, and provides further indication of our commitment and strength of relationship with Leeds City Council."

The project show-cases Colas competencies in highways civils works but also highlights additional diversification with the infill of a local subway underpass, using a foam concrete option not previously used in Leeds. It provides an excellent example of the ongoing integration with the client’s network management team, as Colas devise and implement pedestrian and vehicular management systems, safe guarding local stakeholders and the site team, delivering the works in what is a highly trafficked arterial route between Leeds and Bradford.

There has been minimal disruption to local residents during the scheme as construction has been limited to weekends, nights and off-peak hours. To date, there have been no road closures, however as the completion is nearing this may be necessary in the final weeks of the project. Diversions will be in place, and these have already been agreed with Leeds City Council, ward members and local councillors.

The project started in July 2014 and is due to complete in April. This follows on from the successful Elland Road – Park & Ride Scheme.

Colas had to manage the busy 24 hour traffic, so getting materials and plant to the locations has been logistically challenging throughout the course of the works.

Featured News

Specification news
Forbo refreshes its Eternal vinyl range with innovative...

Forbo Flooring Systems has renewed its Eternal collection of general purpose vinyl,...

Read More >>

Specification news
IronmongeryDirect expands its Jigtech offering

Leading specialist trade supplier IronmongeryDirect has expanded its Jigtech door...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>