Balfour Beatty hands over main viaduct structure at Reading

Public Sector Tue, Mar 22, 2016 5:38 PM

Balfour Beatty hands over main viaduct structure at Reading

The Balfour Beatty project team has handed over the main viaduct structure at Reading to Network Rail and Carillion, ready for track installation.

Reading Viaduct forms part of Network Rail’s £895 million redevelopment of the railway in Reading.

This handover is the third of five sectional milestones on the £45 million viaduct scheme. There are two remaining: the handover of the Feeder Line in October 2014 and the handover of the Festival Line in January 2015.

When the lines become operational in 2015, the new viaduct will ease rail congestion by enabling high speed trains (HSTs) that run on the Great Western Main Line to travel over the freight lines and straight into the station.  

It will also enable Cross Country trains to travel over the freight lines independently of the HSTs so the different train operators will be able to manoeuvre in and out of the Reading area freely and without impeding each other. This is an operating achievement that has not been addressed since Brunel built the first layout in the 1840s, allowing faster passenger services to and from the south west of England.

William Smith, Balfour Beatty Project Director, said: “The achievement of this important milestone is a result of the collaborative efforts of the Network Rail, Carillion and Balfour Beatty team. Working to complete this project safely and to programme would have been more difficult if it were not for the strong collaborative mind-set from everyone involved.”

In line with the company’s commitment to sustainability, Balfour Beatty recycled the majority of materials generated from the site, diverting over 90% of waste from landfill.

With over 400 people working on the project at its peak, Balfour Beatty has worked in partnership with Network Rail and Carillion to ensure this milestone was achieved and this vital rail infrastructure project remains on course for its 2015 completion.

Featured News

Specification news
Forbo expands design possibilities with new Tessera...

Forbo Flooring Systems has enhanced its established Tessera carpet tile collection...

Read More >>

Specification news
Pilkington OptiView protects new collections at museum

Following a £15 million transformation last year, Manchester Museum introduced two...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>