HFI calls for moratorium on new tower block construction

Housing Tue, Jun 27, 2017 3:44 PM

A major new report calls for a moratorium on the construction of new tower blocks until their safety can be assured following the Grenfell tragedy.

The Housing & Finance Institute (HFI) also wants a review into the future of existing high rise blocks, which would consider the feasibility of these buildings being made safe or whether they should simply be demolished.

More than 75 tower blocks have already been identified as being “at risk” by the authorities.

The HFI has set out a three-pronged strategy for ensuring such a disaster does not happen again. Most significantly, the Institute says no new tower block construction should be allowed to start until their safety is absolutely guaranteed.

It says one million new homes by 2022 can still be delivered without high-rise tower blocks, by instead building at greater density and focussing on lower-level dwellings. The report calls for a shift in strategy beyond the centre of London, pointing to more than 70 per cent of all housing opportunity in planning permissions being outside the big metropolitan centres.

The HFI wants building around the country to be accelerated to meet the one million homes target.

Natalie Elphicke, a former government housing adviser and Chief Executive of The Housing & Finance Institute, addressed an audience at the Chartered Institute of Housing: “Following the Grenfell tragedy, we must urgently review the future of high rise tower blocks in our cities.

“Not only should we enact an immediate pause on the construction of new blocks that haven’t yet started, but we should actively consider whether we would be better off simply demolishing the existing buildings identified as being at risk instead of repairing them.

“Some people may reach a conclusion that an end to high-rise means that less homes will be built. That would be wrong for two reasons. The first is the majority of housing delivery is outside London and the big metropolitan centres in any event.

“The second is that high rise is not the only way to deliver large numbers of housing. Low and mid-rise development can provide the same density and better outcomes for residents than high-rise towers.

“Building at greater densities and accelerating construction outside of the cities can deliver the one million new homes we need by 2022 – without risking a repetition of the horrific fire at Grenfell that cost so many lives.”

The Grenfell fire is the deadliest fire on mainland Britain since records began at the turn of the 20th century. It surpassed the previous worst residential housing event, Ronan Point in Newham 1968, which left five dead and seventeen injured.

One of the lessons from the Ronan Point disaster in 1968 is that public confidence in high-rise buildings took a long time to re-build. More than decade after Ronan Point collapsed, high-rise buildings were being demolished because they were unlettable.

But the country’s housing needs are in a very different place from when the aftermath of Ronan Point was being assessed.

In 1969 there was a projected surplus of a million homes. This stands in stark contrast to the million homes ambition to close the housing deficit in 2017.

In 1969 the Government could choose to prioritise new repair and de-prioritise new housing schemes. In 2017, the HFI says the Government will need to do all three – repair, protect, and also secure new homes for current and future needs.

Featured News

Specification news
Keylite’s new Fixed Skylight helps housebuilders with...

Keylite Roof Windows has launched a new Fixed Skylight for roofs pitched from 10...

Read More >>

Specification news
Expertly crafted surfaces from Rearo

Rearo is a leading supplier and manufacturer of bathroom and kitchen surfaces in the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Gerflor Taraflex® Sports Flooring | 2024 | EN Brochure

Gerflor Taraflex® Sp...
By Gerflor

Download Now >>

Gerflor Social Housing Floors | 2024 | EN Brochure

Gerflor Social Housi...
By Gerflor

Download Now >>

Gerflor Retail Flooring | 2024 | EN Brochure

Gerflor Retail Floor...
By Gerflor

Download Now >>

Gerflor Industry Flooring | 2024 | EN Brochure

Gerflor Industry Flo...
By Gerflor

Download Now >>

Gerflor Hospitality Flooring | 2024 | EN Brochure

Gerflor Hospitality...
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>