Value of work in progress up but caution remains

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:18 AM

Value of work in progress up but caution remains

The RIBA Future Trends Workload Index fell a little further in October 2015, standing at +18 (down from +21 in September). This suggests that practices are now more cautious than they were during 2014 and the first part of 2015.

All nations and regions in the UK nonetheless returned positive balance figures. In October 2015, practices in Northern Ireland (balance figure +25) were most optimistic about medium term workload growth; in the Midlands and East Anglia (balance figure +12) there is a greater sense of a temporary peak being reached.

Large practices (51+ staff, balance figure +57) are significantly more optimistic about future prospects than either medium-sized (11–50 staff, balance figure +17) or small practices (1–10 staff, balance figure +16).

The private housing sector workload forecast rebounded further in October, rising to +25 (up from +21 in September). The community sector forecast also saw a modest rise, standing at +3 (up from +1 in September). Meanwhile, the commercial sector workload forecast fell to +7 (down from +13 in September); the public sector workload forecast was unchanged at –3.

The survey also showed that the value of work in progress is 4% higher than in the same quarter in 2014.

The RIBA Future Trends Staffing Index fell back somewhat this month to +9 (down from +12 in September). Nevertheless the Staffing Index remains in positive territory. Large practices (balance figure +29) were more optimistic about future staffing levels, compared with medium-sized (balance figure +4) and small practices (balance figure +9).

Participating practices report that they are now employing 3% more staff than this time last year.

RIBA Executive Director Members Adrian Dobson said: “The market for architectural services remains buoyant, but with a clear sense that there has been something of a slowdown in the overall pace of growth in the last few months.

“The 4% increase in the value of work in progress, compared with the equivalent quarter in 2014, shows a continuing very healthy rate of annual growth. This is nevertheless a step down from the rates of 8–10% that we saw consistently throughout 2014 and early 2015, and shows some cooling in the overall market for architectural services.

“Mirroring the trend in the Workplace Index, the RIBA Future Trends Staffing Index also declined this month; our practices are now sounding something of a note of caution about future staffing levels. Still, there continues to be plenty of anecdotal evidence of practices having difficulties recruiting staff with the levels of skills and experience that they are looking for.”

Featured News

Specification news
LUXURY HOTEL UPGRADES CLUBHOUSE WITH NATURAL INSULATION...

Natural building materials from Ecological Building Systems, based in Carlisle, have...

Read More >>

Specification news
Crown Paints bring bespoke luxury to Blackpool...

A traditional hotel in Blackpool has been transformed into nine bespoke luxury...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>