Less than one in six firms fully ready for BIM as deadline looms

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:17 AM

Less than one in six firms fully ready for BIM as deadline looms

Fewer than 1 in 6 firms (16%) in the building services sector are ‘fully ready’ to use Building Information Modelling (BIM) on projects, according to new survey findings from the Electrical Contractors’ Association (ECA).

With the government deadline for the mandatory use of ‘BIM Level 2’ in all Whitehall-procured contracts just months away, nearly 6 in 10 firms (57%) said they were not fully ready, while over 1 in 4 (27%) said they were ‘not ready at all’ (please see attached graph).

Yet, despite the above findings, nearly two-thirds of respondents (65%) say that BIM Level 2 will be ‘good for the sector’, while almost 6 in 10 (57%) say it will be the ‘future for building services’.

ECA Director of Business Services Paul Reeve commented: “The survey results show that ‘BIM awareness’ is generally high across building services, but many contractors, and others associated with our sector, still have a long way to go to be ready for the government’s 2016 BIM deadline.

"The results indicate that while some companies have already engaged successfully with BIM, many more have yet to engage with the aspects that allow effective information sharing with others in their supply chain.

"In addition to flagging up our findings to government and the industry, we will be working with our ‘BIM readiness’ partners to tackle the important gaps identified by the survey, as soon as possible.”

The sector-wide ‘BIM readiness’ survey was held in conjunction with the Chartered Institution of Building Services Engineers (CIBSE) and building services and engineering consultancy BSRIA.

CIBSE Technical Director Hywel Davies said: “This survey confirms that whilst there is a growing awareness of Level 2 BIM in the MEP sector, there is still a real need for more information.

“There is also a requirement for specific tools and guidance for the MEP sector, which CIBSE is working closely with industry partners to develop.”

BSRIA's Principal Consultant and BIM specialist John Sands commented: “The figures revealed by the ECA BIM survey show just how much work is still to be done within the building services industry to be ready for Level 2 BIM.

“However, it also demonstrates the positive approach to the changes it will inevitably bring, and that is an important aspect of this survey.”

The survey has attracted sector-wide support, including from SELECT, the Building and Engineering Services Association (B&ES) and BEAMA.

The full results of the survey, which attracted hundreds of responses from contractors and others associated with the sector, will be released shortly.

Featured News

Specification news
Zoo Hardware refreshes luxury Italian-inspired Rosso...

Zoo Hardware, a leading manufacturer of door hardware, has announced the addition of...

Read More >>

Specification news
Knauf Insulation’s sustainability credentials hit the...

Manchester is known for its rich cultural heritage, but now Co-op Live, the UK’s...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>