Health Tue, Nov 8, 2016 10:08 AM
Geberit Mapress‘ speed of installation has contributed to Northern Ireland's largest Level 2 Building Information Modelling (BIM) project, the Wellcome-Wolfson Institute, located on the Health Science Campus at Belfast City Hospital.
Completed in a record 17 months, building services were Installed by the Harvey Group whichwon ‘Best Installer Team‘ for its efforts in last year's Geberit awards.
Providing a state of the art, purpose-built building, the Wellcome-Wolfson Institute specialises in scientific research to develop cures for eye disease and diabetes plus a programme to understand the genetics of complex chronic diseases, such as cancer. Many of the building services installed have to deal with specific laboratory environment challeneges, such as chemicals and high temperatures.
Geberit Mapress Stainless Steel was used for the building's low temperature hot water and chilled water systems, the mist fire supression system and natural gas. Geberit Mapress Copper services drinking water, rainwater harvesting and high temperature drainage systems. Alongside Geberit Mapress copper, Geberit HDPE transports laboratory chemical water, safety cabinet and fume cupboard drainage.
Robert Hall, from the Harvey Group, said: "We chose Geberit piping systems for the versatility, ease of installation and quality. The project was under specific time constraints and the Mapress press fit system worked with the BIM modelling in terms of getting the project completed in the fastest time possible."
"Apart from speed of installation, we also needed products that would cope with the challenges of the laboratory environment. Geberit HDPE in particular proved ideal for transporting laboratory chemical water."
HDPE (High Density Polyethylene) is resistant to high temperatures and aggressive media, such as chemicals - it can withstand around 95% of all commercially available alkalis, acids and chemicals - making it suitable for range of applications; including roof drainage systems and laboratories, as is demonstrated at the Wellcome-Wolfson Institute.
Adding to the building's sustainable credentials, Polyethylene is environmentally friendly and completely recyclable, with no toxic emissions released during its processing, or in case of fire.
The Wellcome-Wolfson institute demonstrates how BIM can be used successfully to help a building meet its requirements; in this case, being fit for purpose, sustainable and completed in a short timeframe. Products such as Geberit Mapress fit well with BIM, helping building designers and contractors get piped building services installed quickly, with a ‘right first time' approach.
The Harvey Group is the first solely-dedicated M&E organisation to go through the process of becoming BIM Level 2 accredited and one of only two UK contractors to reach this level - the first in Ireland.
Featured News
In busy hospital environments, expansion projects and building works must be planned...
A Mapetherm System has been used to complete an external surface refurbishment at...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London