Mace completes new AstraZeneca facility ‘The Hub’ to support life sciences community in Cambridge

Latest News Fri, Oct 4, 2024 6:03 AM

Mace, the global consultancy and construction company, has completed its latest project for AstraZeneca on the world-famous Cambridge Biomedical Campus.

Providing valuable facilities and services to both employees and the public, The Hub is set to become a new centre for health, wellbeing and support services that aims to enhance the lives of the campus community, contributing to a more productive and healthy work environment.

The building was handed over at an official ceremony with Rob Bridges, Project Director at Mace Construct, Andrew Smith, Executive Director - Special Projects, AstraZeneca and Caroline Durkin, Head of Cambridge Operations, AstraZeneca present.

With an internal floor area of 3,666m2, the project includes a comprehensive environment designed for relaxation and reflection, incorporating a café, bar, shop, fitness centre, treatment rooms, health screening and occupational health services, a nursery and preschool, and a garden.

The Hub was constructed using an exoskeleton concrete frame, inverted roof and a combination of Accoya timber cladding and curtain walling for the façade.

Embracing sustainability from its conception, the new Hub facility is targeting a BREEAM Outstanding rating. Notably, the project saved 5 tonnes of CO₂ through the reuse of excavated soil and incorporates 260 photovoltaic panels to enhance energy efficiency.

Standout features also include a box-in-box system for acoustic separation in the studios and sprung floors for optimal auditory performance, and by leveraging learnings from decades of delivering complex projects across the globe, all of AstraZeneca’s specifications were met in a short timeframe.

Robert Lemming, Managing Director, Public Sector and Life Sciences, Mace Construct said: “The Cambridge Biomedical Campus is a centre for the UK’s and Europe’s flourishing life science industries, making a significant contribution to research and development.

“Supporting all the people that contribute to the Campus community and beyond to thrive and perform their vital roles, AstraZeneca’s newest building ‘The Hub’ will provide important services for their health, wellbeing and productivity.”

The completion of The Hub follows Mace’s successful delivery of AstraZeneca’s Discovery Centre. A state-of-the-art global research and development facility located in the heart of the Campus. Designed to the world’s highest environmental standards, it accommodates over 2,200 research scientists and features the most advanced robotics, high-throughput screening and AI-driven technology.

The Cambridge Biomedical Campus is the largest employment site in Cambridge, with a 17,500-strong community of healthcare professionals and research scientists. It provides world-class biomedical research, patient care and education on a single site.

Featured News

Specification news
Construction starts struggle to maintain post-election...

The value of underlying starts fell 3% against the preceding three months, standing...

Read More >>

Specification news
Futurebuild unveils FutureX Digital Disruptors

Futurebuild, the leading event for forward-thinking innovation in the built...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>