Redcliff Quarter is a bustling new neighbourhood for Bristol, bringing together restaurants, a 4-star hotel, offices and apartments. The 600,000 sq ft development has an urban artisan design reflecting the area’s industrial heritage. The architecture includes wider pavements, rooftop and courtyard gardens, balconies and terraces, targeting BREEAM excellent ratings for the commercial buildings.
Derbigum Blue Roof System:
Alumasc’s Derbigum BluRoof is designed to alleviate flood risk by reducing and controlling the peak rate of discharge, in compliance with design requirements. This facilitates the detention of stormwater up to a prescribed maximum hydraulic head for subsequent controlled discharge over an elongated period.
The retention of stormwater in the green roof layers complements the detention of stormwater by the blue roof, providing valuable additional drainage capacity.
The Derbigum BluRoof system benefits from the combined expertise associated with Alumasc Roofing Systems and Harmer Engineered Drainage Systems; allowing a truly single source blue roof solution that is integral to a system of this nature. The Derbigum BluRoof system is fully BBA approved and Alumasc provide a service package that provides the client, specifier and end user with complete confidence in the integrity of the waterproofing and drainage solution.
Green Roof and Landscaping:
Blackdown Greenroofs installed a combination of extensive sedum green roofs, intensive green roofs, paving on terraces and podiums and over the Alumasc Derbigum BluRoof. Blackdown also installed the bespoke papyrus coloured powder coated planters, with integral hard wood seating. They were specifically designed to make the roof spaces a recreational asset to those living in the apartments. Planted with mixed herbaceous, shrubs and trees, the hard and soft landscaping areas provide the perfect place to relax.
Alumasc Roofing Systems provided design assistance throughout all architectural, structural and drainage engineering stages. The technical team worked closely with the Main Contractor providing further assistance throughout construction stages. Blackdown Greenroofs worked with both the Main Contractor directly as well as via Span Roofing who carried out the roofing installation sub-contractor package. Alumasc Roofing’s site monitoring technical teams carried out regular site visits to ensure compliance with the warranty and that codes of practice were observed through to completion.
One system supplier, one point of contact, one waterproofing installation team and Alumasc’s Blackdown Greenroofs provided a single source solution to the successful completion of the works thus limiting potential split responsibility.
In association with Alumasc Roofing
Quick Links
Company Details
Featured News
Sensitively designed to keep a low profile in its exceptional surroundings, the new...
East London’s Whitechapel Station, which will eventually become one of the stations...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
New Build -
By Alumasc Roofing
Roof Pro PP-3 & Roof...
By Alumasc Roofing
Roof Pro
By Alumasc Roofing
Our Beliefs and Valu...
By Alumasc Roofing
Blackdown Greenroofs...
By Alumasc Roofing
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Easy to install and secureLite-Anchor is a compatible fixing to secure lightning conductor tape to a...
The Roof-Pro Proliner is a rainwater refurbishment outlet made from durable materials for...
Fully-integrated flat expansion joint sealed into the waterproofing RedLINE and FlamLINE expansion...