Latest News Wed, May 27, 2020 11:52 AM
A new product has been released to help check individuals’ temperatures as they enter a public space. The Health Check Station by Contour Heating has been designed to help control the spread of infection in the wake of the Covid-19 pandemic.
Manufactured from mild steel with a BioCote® anti-microbial powder coating, The Health Check Station has been designed with safety and efficiency in mind. A durable Perspex screen with a small cut out provides the user with a safe means of checking employee and visitor temperature upon arrival.
With a letterbox-style slot for documentation (such as registers and time-sheets) and informative signage to help reinforce key messages in relation to government guidelines, The Health Check Station can be used in offices, factories, retail units, public buildings, schools and much more.
The Health Check Station is available directly from Contour Heating. Call +44 (0) 1952 290 498 to find out more or head over to www.contourheating.co.uk.
Featured News
A team of construction students brought the Chartered Institute of Building’s...
Bricklaying, Site Supervisor and Surveying apprentices welcomed HRH The Princess...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
FRAMESAFE FR A2 FIRE...
By Glidevale Protect
A Guide to Aluminium...
By F.H. Brundle
Handrailing & Balust...
By F.H. Brundle
RLG600 Access Floori...
By Kingspan Data & Floo...
RHG600 Simploc
By Kingspan Data & Floo...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Straightcurve® Product Range Overview - A Demonstration of Installation Ease
In progressive and dynamic business sectors, such as construction, it’s natural to be forward...
Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...