First big HS2 contracts revealed

Public Sector Mon, Jul 17, 2017 9:11 AM

The winners of the major construction contracts for Britain’s new railway have been announced, with the £6.6 billion contracts supporting 16,000 jobs across the country.

The huge infrastructure investment covers the main civil engineering work on the first phase of HS2 between London and Birmingham – including construction of tunnels, bridges, embankments and viaducts.

Transport Secretary Chris Grayling announced the decision to award contracts today, which will mean the new high speed link reaching Birmingham by 2026.

David Higgins, Chairman of HS2 Ltd, said: "This is a huge day for the HS2 project and for the country. These contracts will support 16,000 jobs here in Britain and will create opportunities for thousands of SMEs.

"HS2 was always designed to be much more than just a high speed railway and today we can see the opportunities it brings right around the country - spreading prosperity, acting as a catalyst for investment and rebalancing our economy 10 years before the railway even opens. Business now has the surety to invest with confidence to build a legacy for Britain."

The winning bidders to build the first phase of the route are:

Area South

  • Euston Tunnels and Approaches – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)
  • Northolt Tunnels – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)

Area Central

  • Chiltern Tunnels and Colne Valley Viaduct – Align JV (Bouygues Travaux Publics, VolkerFitzpatrick, Sir Robert McAlpine)
  • North Portal Chiltern Tunnels to Brackley – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)
  • Brackley to South Portal of Long Itchington Wood Green Tunnel – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)

Area North

  • Long Itchington Wood Green Tunnel to Delta Junction and Birmingham Spur – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement)
  • Delta Junction to WCML Tie-In – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement).

HS2 could carry more than 300,000 people a day. And with fast trains using the new line, there will be extra space for more trains on the existing rail network.

Benefits will be felt across the network with trains running as far as Scotland and the number of seats available out of Euston in peak hours more than doubled.

In total, construction of the full HS2 route to the north-west and Yorkshire will create up to 25,000 jobs and 2,000 apprenticeships. Another 3,000 people will operate HS2 and it is estimated that growth around new HS2 stations will create another 100,000 jobs.

In February, Parliament granted powers to construct the Phase One route from London Euston to Birmingham, with the route opening in 2026.

Preparatory works are already underway, with main construction work starting in 2018/19 following a period of detailed design work.

In addition, HS2 stations at Euston, Old Oak Common and in Birmingham will be central to HS2 and the work needed to develop designs is also well underway. Both the invitations to tender (ITTs) for the station design services contracts for all 4 Phase One stations and the invitation to participate in dialogue (ITPD) for the Euston Master Development Partner have been released to shortlisted bidders.

These are significant milestones which show how progress is continuing to deliver stations that will be embraced by the local communities, drive economic growth and provide seamless journeys for passengers.

A series of other HS2 announcements are taking place today.

The Transport Secretary will today publish a Bill to deliver the next phase of HS2, from the West Midlands to the West Coast Main Line south of Crewe.

This means - subject to Parliamentary approval - this part of the route can open in 2027, 6 years earlier than planned, to bring the benefits of HS2 to the north and Scotland sooner.

The Transport Secretary will also confirm the final Phase 2b route, from Crewe to Manchester and Birmingham to the East Midlands and Leeds. This phase will complete HS2 and unlock the transformative project’s full benefits for the country.

Featured News

Specification news
Gatic UltraSlot takes on massive port expansion at...

The Port of Huelva in Andalusia has undergone a €40 million expansion, which saw...

Read More >>

Specification news
Abloy UK unveils Primo electronic access control...

Abloy UK has launched the new Primo electronic access control solution, developed in...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>