Latest News Fri, Jan 13, 2017 11:16 AM
The shortage of aerated concrete blocks in the UK, caused by a reduction in the availability of fresh Pulverised Fuel Ash (PFA) is causing long delays on construction sites. A by-product of coal-fired power stations, PFA is an essential ingredient of concrete blocks, giving them their thermal insulation properties. A warm winter, low gas prices and gradual closure of coal-fired plants for cleaner energy sources has reduced the amount of available PFA.
Styrene Packaging & Insulation worked closely with the client and concrete beam manufacturer to design a holistic solution. The unique Stylite T-Beam Suspended Floor Insulation solution comprised of lightweight Expanded Polystyrene (EPS) panels contour cut to suit the profile of the concrete beams. The interlocking EPS panels were installed between the beams with the “toe” extending underneath to provide the all round insulation and eliminating cold bridging. The panels specified were 230mm deep to achieve a U-value of 0.22 W/m2K meeting the clients requirements for Building Regulations. To complete the floor design a macro fibre concrete screed topping of 75mm was specified.
The Stylite T-Beam offered the following major benefits to the client:
Featured News
In the creation of unique and impactful architectural design, architects need to have...
Larger retailers are investing increasing sums in updating and expanding their...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London