NHS commissions low carbon biomass heating system

Health Wed, Mar 23, 2016 9:09 AM

NHS commissions low carbon biomass heating system

Lancashire Care NHS Foundation Trust has chosen biomass technology supplied by Rural Energy to heat its new £40 million mental health facility ‘The Harbour’, in Blackpool.

The new biomass boiler has helped The Harbour project meet the high standards set by BREEAM to deliver a sustainable and low carbon building with a long future lifespan. In addition, the Herz BioFire 600kW boiler will greatly reduce the facility’s energy bills whilst also providing a significant income from the government’s RHI scheme.

This design and development process was led by principal contractor Integrated Health Projects (IHP) - the P21+, Sir Robert McAlpine/VINCI Construction UK joint venture.

In alignment with the Trust’s commitment to using low carbon technologies, Rural Energy has worked closely with NG Bailey, the M&E contractor on this project, to understand the Trust’s scope and expectations. Providing expert advice and guidance since the beginning of the project, Rural Energy specified a bespoke biomass solution that included a Herz BioFire 600kW biomass boiler and a giant underground fuel store for the state of the art facility.

In partnership with NG Bailey and Glosflume, the installation began in February 2014 and incorporates the largest fuel feed and store that Rural Energy has ever installed. The massive 157m3 fuel store was specified as part of a complicated design process and will reduce the number of fuel deliveries needed, but more importantly, will also reduce potential disruption to residents of the facility.

The installation was further supported by filtration specialists Glosfume who provided an advanced ceramic filtration system. Nigel Black, Technical Manager at Glosfume, said: “The ceramic filtration system is extremely effective and will remove the particulates from the boiler emissions down to a level comparable with a gas boiler and improve the air quality of the surrounding area.”

The Harbour, which has 154 bedrooms, is one of the largest facilities of its type in the North West and will provide high quality inpatient care to those recovering from mental health issues.

Paul Clark, Managing Director at Rural Energy, commented: “This was a challenging project with tight timescales and significant space limitations on site but we are delighted with the finished result. Rural Energy has been involved with this project for a number of years, providing technical and logistical advice since the public consultation stage. We have journeyed with the Trust and provided a bespoke renewable solution that will provide low-cost energy long into the future.”

David Hughes, Project Engineer at NG Bailey said ‘The project involved an incredible amount of upfront planning with regular design reviews, so it’s great to see the work complete with the facility receiving its first delivery of wood chip just recently.”

Both the physical size of the biomass plant and the layout of the site required expert planning from Rural Energy and its partners. The design of the fuel store was particularly complex with the three 5m filling screws installed at a low level to fully utilise the storage space in the bunker for wood chip.

Alistair Rose, Project Director at Lancashire Care NHS Foundation Trust, said: “Finding the right renewable energy solution for this project was absolutely key, and we are so pleased with the way Rural Energy and NG Bailey have partnered with us to achieve our low carbon targets.

"The highly cost effective heating solution and the requirement to reduce fuel delivery frequencies and costs by using the largest vehicles possible, influenced the layout of the whole site and the location of the energy centre relative to the site circulation road. As a result, the details and benefits of the heating solution had to be understood at a very early design stage for the whole project to support and influence the project architects.

"The biomass heating solution was expertly managed and delivered, and will ensure that heating costs of the facility are kept to a minimum.”

With 12 years at the leading edge of biomass technology, Rural Energy is one of the UK’s most experienced biomass distributors and installers, and is the sole UK supplier of the Austrian Herz brand of boiler. Rural Energy offers a full turnkey service from survey and design, through to installation and on-going maintenance.

Featured News

Specification news
David Bailey Furniture – helping to enhance patient...

David Bailey Furniture Systems (DBFS), a leading manufacturer of specialist...

Read More >>

Specification news
Senior specified for UK’s first carbon-neutral built...

The new Canon Medical Arena in Sheffield has been designed by architects Bond Bryan...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>