NEW TIMOLEON UNDERFLOOR SYSTEMS WILL AID SWITCH TO DRY CONSTRUCTION AND HEAT PUMPS

Latest News Tue, Mar 22, 2016 4:55 PM

NEW TIMOLEON UNDERFLOOR SYSTEMS WILL AID   SWITCH TO DRY CONSTRUCTION AND HEAT PUMPS

Underfloor heating specialist Timoleon has launched two new products purpose designed to match increased use of timber and other “dry” construction methods – and the fast rising popularity of low energy systems powered by heat pumps.

Timber constructions are faster to build, have lower embodied energy and can be easily prefabricated. As they become more popular, it’s important that heating technologies are improved to ensure these features aren’t compromised.

The underfloor heating needs to integrate with the timber building - providing the same performance that can be expected from traditional screeded systems - but at low water temperatures if the heat pump COP is to be maximised

A study undertaken for Timóleon by the research and test team at BSRIA shows that a really good underfloor system can produce the same heat output from water up to 10ºC cooler. With most heat pumps this represents an improvement in efficiency (COP) of over 20%!

Combined floor deck
Timoleon’s Toron flooring system combines a floor deck with an underfloor heating system in a single, structurally loaded entity.

The new, patent pending, system comprises 22mm thick panels of moisture resistant, flooring grade chipboard, ready tongue and grooved and routed to accept Timoleon's 10mm polybutylene underfloor heating pipe.

Pipe is fitted into the channels on the upper surface of the chipboard modules - thus ensuring that the heating element is as close to the floor finish as possible. This maximises the heat output of the modules, while reducing the temperature of the water required.

As the panels are laid like any conventional floor installation of the underfloor heating becomes even faster.

Screeds are a perennial problem. Whether underfloor heating is installed or not, real problems are created when floor finishes are laid on “wet” screeded floors. The moisture will eventually permeate through the screed into the finish. Wood flooring is particularly sensitive to changes in moisture.

A rule of thumb for the drying time of screeds is 1 day per mm of thickness and with screeds being typically 65mm thick this translates into over two months of waiting,

Time on site is precious and removing the need to screed reduces construction time - there’s no waiting with a dry floor.

Conventional dry construction underfloor heating systems have a quick warm up relative to screed systems due to the lower mass. This is recognised in the SAP ratings. If the system responds faster it can be more efficient, it will not suffer from “lag” where there is unwanted energy in the floor, after the thermostat has switched off.

Again it’s important to get the same performance from a “dry” construction as from a screeded floor.

New Timoleon FoilBoard SRB (screed replacement board) comprises high efficiency insulation material with a layer of aluminium bonded to the upper surface – into which channels are preformed ready to accept Timoleon’s 15mm polybutylene heating pipe. The system is then topped with a floating floor of screedboard.

Where required pipework centres can be closer than standard 200mm to maximise the efficiency of the heat pump - achieving full comfort conditions from comparatively low temperature water.

Both straight and loop return sections are available, all of which can be easily cut – Timoleon uses soft tempered aluminium - to meet the exact dimensions of the floor.

Click here to visit website

Featured News

Specification news
Showersave supports industry leaders in addressing Part...

Showersave has sponsored and participated in a recent Building Insights LIVE...

Read More >>

Specification news
INSTANTOR PROVIDES 50 YEAR GUARANTEE ON ITS PRESS...

The Instantor Press System, an all-in-one solution combining press fittings and...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>