New Keraflo Twin KP valve system ensures constant fresh water

Health Tue, Mar 22, 2016 5:28 PM

New Keraflo Twin KP valve system ensures constant fresh water

The Garrett Anderson Centre (GAC) is a recently constructed, self-contained building within the Ipswich Hospital complex.

The GAC is supplied with water through a break tank on the ground floor that in turn feeds a storage tank in the roof through a booster set. Both tanks are divided into two, which provides easy maintenance and cleaning access while ensuring an uninterrupted supply of water to the 24/7 facility.

The problem with having a divided tank is finding two independent valves to refill each side of the tank that both work simultaneously.  If one valve opens earlier than the valve on the other side of the tank and keeps up with demand, the other valve won’t open at all. This can lead to problems with the health and hygiene of the water supply on the side with the later opening valve, as the water tends to stagnate.

Furthermore, if one valve tends to open first, it leads to uneven wear, such that the earlier opening valve will gradually become looser, while the valve feeding the other side of the tank can become gradually stiffer and this will only accentuate the differential opening rates. Issues can then occur in the static tank with bacterial growth, stagnant water and of course the ever-present danger of Legionnaire’s Disease; in severe cases a biofilm can occur.

The Keraflo Twin KP is a new system that was developed with Kier Construction to overcome this problem and offers a unique solution to the market. The Twin KP uses two main control valves, one on each side to fill the tank, supported by two smaller pilot valves. The two main control valves are triggered by the pilot valves; whichever pilot valve opens first then opens both control valves simultaneously, thereby filling both sides of the tank.

Neil Weston, sales manager for Keraflo, says: “The Twin KP solution with its double valve system overcomes the issue of any imbalance in refreshing the water stored within either side of the tank.

“Both sides fill at the same rate, ensuring regular replacement and refreshment of the stored water to the GAC.

“What’s more, the design ensures that servicing and maintenance is just as easy for the Twin KP as for a conventional system. Shutting the valves on one side down and isolating that end of the tank still allows the engineer to keep the other side in service.”

Featured News

Specification news
Simplifying hospital projects with Eurobrick

In busy hospital environments, expansion projects and building works must be planned...

Read More >>

Specification news
Mapetherm System repairs & protects external surfaces...

A Mapetherm System has been used to complete an external surface refurbishment at...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>