New Keraflo Twin KP valve system ensures constant fresh water

Health Tue, Mar 22, 2016 5:28 PM

New Keraflo Twin KP valve system ensures constant fresh water

The Garrett Anderson Centre (GAC) is a recently constructed, self-contained building within the Ipswich Hospital complex.

The GAC is supplied with water through a break tank on the ground floor that in turn feeds a storage tank in the roof through a booster set. Both tanks are divided into two, which provides easy maintenance and cleaning access while ensuring an uninterrupted supply of water to the 24/7 facility.

The problem with having a divided tank is finding two independent valves to refill each side of the tank that both work simultaneously.  If one valve opens earlier than the valve on the other side of the tank and keeps up with demand, the other valve won’t open at all. This can lead to problems with the health and hygiene of the water supply on the side with the later opening valve, as the water tends to stagnate.

Furthermore, if one valve tends to open first, it leads to uneven wear, such that the earlier opening valve will gradually become looser, while the valve feeding the other side of the tank can become gradually stiffer and this will only accentuate the differential opening rates. Issues can then occur in the static tank with bacterial growth, stagnant water and of course the ever-present danger of Legionnaire’s Disease; in severe cases a biofilm can occur.

The Keraflo Twin KP is a new system that was developed with Kier Construction to overcome this problem and offers a unique solution to the market. The Twin KP uses two main control valves, one on each side to fill the tank, supported by two smaller pilot valves. The two main control valves are triggered by the pilot valves; whichever pilot valve opens first then opens both control valves simultaneously, thereby filling both sides of the tank.

Neil Weston, sales manager for Keraflo, says: “The Twin KP solution with its double valve system overcomes the issue of any imbalance in refreshing the water stored within either side of the tank.

“Both sides fill at the same rate, ensuring regular replacement and refreshment of the stored water to the GAC.

“What’s more, the design ensures that servicing and maintenance is just as easy for the Twin KP as for a conventional system. Shutting the valves on one side down and isolating that end of the tank still allows the engineer to keep the other side in service.”

Featured News

Specification news
Leak Resistant Wet Rooms Whether Upstairs or Down

Over 10 million people in the UK are aged 65+ and this figure is set to grow.[i] Add...

Read More >>

Specification news
Crown Paints launch new Colour Insights for 2025

Crown Paints has launched its Colour Insights 2025/2026, a collection of five...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

NURTURE EARLY YEARS CUBICLES
NURTURE EARLY YEARS CUBICLES

The Nurture Range provides child-friendly, durable 12mm SGL washroom solutions for nurseries and...

Read More >>

Triumph Custom-fit Cubicles For The Most Sophisticated Spaces
Triumph Custom-fit Cubicles For The Most Sophisticated Spaces

Triumph Privacy offers enhanced privacy while maintaining the sleek aesthetic of the Triumph range....

Read More >>

ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION
ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION

Elevate cubicles offer enhanced height and privacy for superior comfort and security. Durable nickel...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>