MIB MetSIP used on grade A office development

Regeneration Tue, Mar 22, 2016 5:13 PM

MIB MetSIP used on grade A office development

Property Development company JR Smart chose MIB’s Infill Panel over traditional methods to build the outside walls of their 80,000sq.ft speculative office development at Capital Quarter, a stone’s throw from the capital’s John Lewis store,  St Davids 2 retail development and the Central railway station.
 
The concrete superstructure makes an ideal partner for the 136mm structural insulated panel and the work was carried out in a fraction of the time that traditional methods would have taken. The 0.20 U value of the panel also saved on additional trades and materials to bring it up to applicable standards.

Other savings were achieved by manufacturing off-site at MIB’s Blaina factory , thus minimising waste , site storage and traffic movements.

Operations Manager Dean Bennett oversaw the installation for MIB and said: “We were able to dovetail with the developer’s schedule perfectly due to the proximity of the factory and the control that gives us. The weather was particularly bad but this product can be installed when other methods are impractical.”

Work has now started on the glazed curtain wall façade which is just one of the many finishes which can readily be fixed to the panel due to its innovative construction.

Gareth Smart of JR Smart commented: “Being a speculative development it was important that we used a system which could be put up quickly so that prospective tenants can envisage the office block. The MIB system enabled us to achieve our targets.”

Featured News

Specification news
Arturo EP3900 – high-build resin coating

Arturo EP3900, the high-build epoxy resin coating that sets a new standard for...

Read More >>

Specification news
Hunter Douglas helps to transform central London office

One of the stunning Hunter Douglas solid wood grill ceiling and wall systems has...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>