ISG unveils InterContinental London Westminster after only 39 weeks

Hotel, Sport & Leisure Tue, Mar 22, 2016 5:08 PM

ISG unveils InterContinental London Westminster after only 39 weeks

ISG has successfully completed a turnkey programme to deliver a new luxury hotel – the InterContinental London Westminster, in just 39-weeks on behalf of developer Supreme Hotels.

The £37 million project saw ISG work under an open book management contract to fast-track the 256 bedroom scheme and complete the hotel within the accelerated timeframe.

ISG’s innovative approach involved putting in place multiple suppliers and subcontractors for each element of the build, reducing the risk of any delays to the extremely tight programme and ensuring turnkey project delivery with a full fixtures, fittings and equipment (FF&E) contract.

Involved in every aspect of the procurement process, ISG worked closely with its client to source the highest quality materials and products from across the globe as part of the FF&E package. Marble was imported from Italy and Spain, with furniture sourced from Italy, China and England and lighting from Germany.

Located close to the Houses of Parliament, InterContinental London Westminster is the first InterContinental Hotel to open in London for 36 years. The building was formerly the offices of the Government’s Treasury Solicitor and has now been converted to offer 256 en-suite guest bedrooms over six floors, including 44 suites.

ISG has created a substantial presidential suite on level six, along with an executive style club bar and lounge area on the first floor. Meanwhile, the ground floor has been extensively remodelled to accommodate a high specification lobby, lobby lounge, a winter garden area, contemporary restaurant and a sophisticated feature pub.

The refurbishment also included the installation of seven new lifts, a feature helical staircase, back of house offices and facilities, restaurant and bar kitchens and a range of conference and banqueting accommodation at basement level, along with a gym for hotel guests.

The project also saw the construction of a new porte cochère to provide covered vehicular access along with the refurbishment of the building’s façade and windows, including some architecturally listed elements, as well as the construction of a large plant deck at roof level.

Peter Kilby, managing director of ISG’s Hotels division, commented: “Completing a project of this size and scope within such a short time scale required specialist expertise, a dynamic team and close co-operation across the delivery partners. The only way to achieve delivery of such a complex and demanding scheme was via a management contract that would enable all stakeholders to work in a collaborative and efficient manner towards the delivery timescale.

“With 36 different room layouts, a completely enclosed site and a requirement to remove all external scaffolding for two months during the Olympics and Paralympic Games, this was a scheme of considerable challenges. However, precision management, just-in-time site deliveries and a team of up to 700 construction professionals working on site at any one time, ensured that we were able to deliver to exacting five-star standards within our client’s deadline.”

Featured News

Specification news
Nelson Place enhances its student facilities with...

The Nelson Place development in Belfast, the city’s largest purpose-built student...

Read More >>

Specification news
Wade and Gatic drainage package chosen for...

Wade Linear Channel Drains and Gatic Parade Access Covers from Alumasc Water...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>