Ex-or - making light work at flagship council offices

Regeneration Tue, Mar 22, 2016 5:01 PM

Lighting management from Ex-Or has helped Birmingham City Council make the claim that its new £38 million flagship office development is the UK’s most environmentally friendly council property ever built.

10 Woodcock Street in Aston comprises 22,000 sq m of accommodation on five floors and will accommodate more than 3,000 council workers when it becomes fully occupied later in the year.

Ex-Or's MLS Digital Managed Lighting System was installed throughout the building to control the 4,000 light fittings situated in open plan office areas, corridors, meeting rooms, washrooms and lobby areas.

The Ex-Or MLS Digital Managed Lighting System provides fully integrated lighting management which uses communicating presence detectors that share information on occupancy patterns throughout the building. This means it automatically provides optimum lighting conditions - delivering light only when it is required, ensuring no energy is wasted.

Rows of work stations within the open plan areas are controlled by the MLS. In addition, intelligent daylight sensors in work areas close to perimeter glazing and the four internal atria ensure maximum benefit is derived from natural lighting.

Increasingly, large organisations such as local authorities are turning to lighting control to eliminate the unnecessary use of lighting in their buildings. This helps them meet their environmental commitments under schemes such as the CRC (Carbon Reduction Commitment) and BREEAM (Building Research Establishment Environmental Assessment Method). The extensive use of lighting management, and the incorporation of a number of sustainable solutions within the building, mean 10 Woodcock Street is on target to achieve an “Excellent” BREEAM rating.

Birmingham City Council wanted to achieve a modern 21st century enhanced working environment for its employees, whilst making substantial savings in energy use. As well as delivering significant energy savings, the MLS Digital Managed Lighting System plays its part in providing an optimum lit environment in which occupants can work with maximum productivity.

EMCOR Group (UK) carried out the lighting installation on behalf of main contractors Thomas Vale Construction. Luminaire UK supplied the specially designed light fittings to EMCOR and commissioned Ex-Or to provide lighting control using the MLS Digital Managed Lighting System.

Ian Bury, managing director of Luminaire UK, the leading designers and manufacturers of commercial, retail and industrial luminaires, said: “Birmingham City Council wanted to incorporate cutting edge sustainable building techniques and technologies into the new building. Lighting control from Ex-Or is making a significant contribution to the Council’s aims of both achieving substantial cuts in energy use and meeting its environmental obligations.

“We have incorporated Ex-Or lighting management into other projects so we were confident Ex-Or would deliver significant savings and prove totally reliable in operation.”

The completed building houses a range of best practice sustainable features including combined heating and power supply, passive ventilation, rainwater harvesting, and photo-voltaic panels to generate electricity. It even has a “brown roof”, a rooftop garden designed to attract local wildlife and to provide additional building insulation against heat loss.

The new building has been developed as part of the Working for the Future programme and will ensure the council delivers more than £100 million of savings over the next 25 years.

Featured News

Specification news
Light throughout – divide space with glass Skyfold...

Companies looking to divide room space while maximising light should consider the...

Read More >>

Specification news
Promat provides fire resistant glazing solutions for...

Fire resistant glazing and fire-rated glass door-sets manufactured by Promat UK have...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Vertical radiators complete range Brochure

Vertical radiators c...
By Myson

Download Now >>

Myson Radiant Heating Premium underfloor heating systems Brochure

Myson Radiant Heatin...
By Myson

Download Now >>

Which heat emitter is the right one? Brochure

Which heat emitter i...
By Myson

Download Now >>

Sustainable heating solutions for renovation Brochure

Sustainable heating...
By Myson

Download Now >>

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>

UNISENZA PLUS Smart Controls_The complete system solution
UNISENZA PLUS Smart Controls_The complete system solution

With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...

Watch Now >>