Balfour Beatty completes piling works on the new university engineering building

Regeneration Tue, Mar 22, 2016 5:25 PM

Balfour Beatty completes piling works on the new university engineering building

Balfour Beatty Ground Engineering has completed significant piling works on a new engineering building for the University of Sheffield. The new facility will provide almost 20,000m3 of world leading teaching facilities for the University in 2015.

The works which began in July are part of a £49 million construction contract awarded to Balfour Beatty as part of the largest ever capital investment made by the University for its estate.

The site is situated above a weak substrate of coal and rocks which required Balfour Beatty Ground Engineering to install large diameter bored piles up to 15 metres long to provide enough support for the building. Then, a reinforced concrete liner wall with ground floor slabs up to eight metres deep were installed before three kilometres of concrete piles were poured.

Above ground work will start next month on the six-storey building which will include specialist teaching laboratories, lecture theatres, flexible teaching rooms, library and learning resources.  

Drawing on its expertise in delivering iconic buildings, Balfour Beatty will install bespoke triple glazed units with clear, translucent and opaque unitised panels which will provide high levels of thermal performance. This will be encased by an aluminium exoskeleton designed to represent a discrete ‘cellular automaton’ model which is studied in the field of engineering and used by the University to describe how the microstructure of steel changes during processing.

The new engineering building is the latest in a series of large university schemes which Balfour Beatty has been awarded including the Student Union project for the University of Sheffield, as well as the refurbishment for the School of Literatures, Languages and Cultures for the University of Edinburgh and the Pontio Arts Centre for Bangor University.

Keith Lilley, Director of Estates and Facilities Management at the University of Sheffield, said: “The New Engineering building is the lynchpin of our estates development programme over the next decade, not only providing a fantastic state of the art teaching and learning facility at the heart of the campus, but also creating the essential capacity we need to allow an associated programme of upgrading and improvement to other buildings within the engineering estate, as our engineering department continues its remarkable growth.”

Tony Dixon, Managing Director, Balfour Beatty said: “Our ground engineering works have been completed ahead of schedule enabling us to start above-ground construction sooner than expected. This project for the University of Sheffield further strengthens Balfour Beatty’s higher education sector portfolio and will provide one of the most striking educational facilities in the country when complete.”

The project is due for completion in summer 2015.

Featured News

Specification news
Arturo EP3900 – high-build resin coating

Arturo EP3900, the high-build epoxy resin coating that sets a new standard for...

Read More >>

Specification news
Hunter Douglas helps to transform central London office

One of the stunning Hunter Douglas solid wood grill ceiling and wall systems has...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>