The flexible, easy-to-apply, aesthetic properties of Sika’s watertight single-ply membrane proved the ideal solution for a stylish and unusual roof design – the crowning glory of a new, multimillion pound community church.
The £4.5million C3 Centre in Cambridge was built to host community events as well as serve as a place of worship. The two-tier building’s architecturally-striking feature is its ‘fantail’ roof. Tapering to a point at one end, the roof’s design presented a challenge to Farrans Construction, main contractors of the church building project.
The company required a roofing system which not only offered the optimum watertight performance; it had to complement the structure’s eye-catching design. With Cambridge Flat Roofing specified to carry out its installation, the Sika-Trocal SGK system met the contractor’s brief to perfection.
Suitable for both new build and refurbishment applications, in both warm roof and cold roof construction, Sika-Trocal SGK is the best-cost performance bonded membrane for use on all types of substrates. Offering excellent flexibility and high resistance to ageing and weathering, Sika-Trocal SGK ensures a long-lasting, low maintenance roof covering.
Wayne Farrington, Director at Cambridge Flat Roofing, commented: “The roof looks pretty spectacular and certainly offered a challenge in terms of its construction. There’s no doubt the Sika-Trocal SGK system’s specification aided the building process.
“It not only looks as good as it performs, it was simple and quick to install. It made a potentially tricky installation, quite straightforward.”
Work on the church roof started in March 2015. As well as the installation of Sika-Trocal SGK on the 1,500m2 main roof, Cambridge Flat Roofing applied Sika-Trocal’s Type SGmA single-ply membrane as part of a sedum roof build-up on a lower area of the building.
The fully-adhered Type SGK roofing membrane is approved by the British Board of Agrément (BBA) to have a life expectancy in excess of 35 years. Its easy application ensured the church’s stunning roof was completed ahead of the client’s strict eight-week deadline to ensure this gloriously-designed building will remain watertight and functioning as a vital community hub long into the future.