Latest News Wed, Jul 20, 2016 10:29 AM
Contractor Mitchellson Formwork opted for the DOYMA Curaflex pipe sleeve – 3000 and 3000T –as well as the 3001 DOYMA Curaflex pipe sleeve. Also specified was the DOYMA Curaflex 5000 pipe sleeve systempipe sleeve system.
Benefits of the 3000 and 3000/T solutions include homogeneous connection to concrete enhanced by special grooving, plus the inside face of the sleeve provides an optimum contact surface for the elastomer of the Curaflex gasket insert. It forms a watertight bond with the concrete because the coefficient of expansion of the material corresponds to that of concrete and is ideal for buildings without tanking membranes.
The DOYMA Curaflex 3000 and 3001 pipe sleeves are manufactured from a dimensionally stable and resistant special fibrous cement; /T denotes split version for retrofitting around pre-installed services which can then be sealed using a split gasket. The capability to seal leaking service entries without having the inconvenience of disrupting continuity of service resulting from service disconnection is a real advantage.
The DOYMA Curaflex 5000 pipe sleeve is a steel version for high static loads with integrated fixed and loose membrane clamping flanges and can also be installed flush within the shuttering. DOYMA Curaflex sleeves are fire resistant and, in conjunction with an intumescent packing appropriate to the ducted service, not only seal against water ingress (watertight up to 3 bars pressure) but also stop the spread of fire.
Designed by Duggan Morris Architects, R7 is a versatile building that can accommodate small and growing companies as well as larger occupiers requiring an entire floor or more. Over ten floors,R7 integrates shared spaces to encourage collaboration and community, including a 6,000 sq ft communal roof terrace.
R7 is perfectly positioned at London’s main transport hub, with all the amenities of vibrant King’s Cross on your doorstep. The upper office levels have highly flexible floorplates. These can be sub-divided into a variety of smaller or larger areas with the ability to link floors vertically via internal stairs.
Each floor will have at least one terrace, with a large, shared roof terrace on the ninth floor. A basement ‘cycle spa’ provides 260 bike spaces, changing rooms and showers.
Featured News
Beam Contracting, the high-end construction firm, has chosen to utilise the Hardie®...
Work to build London’s super sewer, including its tunnels and shafts, is now fully...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
REVO.Prime TSA 325 N...
By GEZE UK Ltd
Natural ventilation...
By Passivent
PACE 2024
By GEZE UK Ltd
Squash Court Floorin...
By Junckers Limited
Junckers Acoustics F...
By Junckers Limited
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Discreet and secure, the Ei1025 Environmental Sensor can be placed throughout a property to monitor...
The Gateway and Cloud portal use Aico’s SmartLINK technology to bring together data from all...
The Ei3030 is a multi-sensor Fire & Carbon Monoxide (CO) Alarm. Containing our proven and dependable...
CONSTRUCTION VIDEOS - LATEST VIDEOS
In progressive and dynamic business sectors, such as construction, it’s natural to be forward...
Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...
More than 150 sq.m of Vecta aluminium wall lining and a feature bulkhead have been manufactured and...