KINGSPAN OPTIM-R APPOINTED FOR ROYAL PAVILION

Latest News Mon, Feb 24, 2020 12:29 PM

The Kingspan OPTIM-R Flooring System has been fitted as part of a landmark development of luxurious apartments facing on to the new central square in the sustainable community of Poundbury.

Built on Duchy of Cornwall land, the urban extension has been developed in accordance with the architectural and urban planning principals contained within HRH The Prince of Wales’ book ‘A Vision of Britain’, creating a walkable community with a population expected to rise to 5,000 by 2025. The Royal Pavilion sits to the north of the Queen Mother Square. Its ornate design references Greek Revival architecture and includes an iconic lantern, which forms the focal point for Leon Krier’s original masterplan. Its construction has been overseen by C G Fry and Son Ltd in partnership with the Duchy of Cornwall.

A Sustainable Strategy was put in place during the building’s design and a key element within this was to reduce the energy consumed through passive design solutions. To maintain the Pavilion’s neoclassical appeal, the project team were keen to ensure these measures were as unobtrusive as possible whilst still utilising the latest technological advances. To achieve this, the ground floor spaces have heated underflooring and to maximise the efficiency of this system the Kingspan OPTIM-R Flooring System was installed across the entire area.

Kingspan OPTIM-R rigid vacuum insulation panels (VIPs) have a declared thermal conductivity of 0.007 W/mK, outperforming some commonly used insulation materials by a factor of five. This exceptional performance is achieved through a microporous core which is evacuated and sealed within a thin, gas-tight metal envelope and allows project U-values to be achieved with the slimmest possible insulation solution.

As within all Kingspan OPTIM-R projects, Kingspan provided a specialist design service for the application at the Royal Pavilion. The designers used the architectural floor plan to determine the optimum layout for the OPTIM-R VIPs. Any gaps smaller than 300 mm, or areas where penetrations would be required, were filled using rigid insulation infill panels of the same thickness as the VIPs. This planned approach provided a clear installation guideline for the installers and allowed the target U-value of 0.19 W/m2K to be met with an insulation thickness of just 20 mm, limiting the scale of ground works on the project.

The Kingspan OPTIM-R Flooring System is suitable for use with most underfloor heating systems. At the Royal Pavilion, installers laid a protective rubber crumb layer above the floor slab, followed by the Kingspan OPTIM-R Flooring System. Fitting the insulation above the floor slab in this way allows the building to heat more quickly when the underfloor heating is turned on. An additional rubber crumb layer was then fitted above the system, followed by the underfloor heating system and floor screed.

For more information, please contact:

Tel: +44 (0) 1544 387 384

Fax: +44 (0) 1544 387 484

e.mail: info@kingspaninsulation.co.uk

Website: www.kingspaninsulation.co.uk/optim-r

www.twitter.com/KingspanIns_UK

www.linkedin.com/company/kingspan-insulation-uk

Featured News

Specification news
Social homes are 14% less energy efficient

A new study has revealed that the average energy efficiency rating for social housing...

Read More >>

Specification news
The 2024 Civic Trust Awards winners

The Civic Trust Awards proudly celebrated its 65th Anniversary with the Awards...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

REVO.Prime TSA 325 NT Brochure

REVO.Prime TSA 325 N...
By GEZE UK Ltd

Download Now >>

Natural ventilation strategy for Sunderland SEND school Brochure

Natural ventilation...
By Passivent

Download Now >>

Squash Court Flooring Brochure

Squash Court Floorin...
By Junckers Limited

Download Now >>

Junckers Acoustics Floor System Brochure

Junckers Acoustics F...
By Junckers Limited

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Ei1025 Environmental Sensor
Ei1025 Environmental Sensor

Discreet and secure, the Ei1025 Environmental Sensor can be placed throughout a property to monitor...

Read More >>

Ei1000G SmartLINK Gateway
Ei1000G SmartLINK Gateway

The Gateway and Cloud portal use Aico’s SmartLINK technology to bring together data from all...

Read More >>

Ei3030 Multi-Sensor Fire and Carbon Monoxide Alarm
Ei3030 Multi-Sensor Fire and Carbon Monoxide Alarm

The Ei3030 is a multi-sensor Fire & Carbon Monoxide (CO) Alarm. Containing our proven and dependable...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>

Vecta building linings for the perfect finish
Vecta building linings for the perfect finish

More than 150 sq.m of Vecta aluminium wall lining and a feature bulkhead have been manufactured and...

Watch Now >>