Universities turn to Portakabin to meet demands

Health Fri, Mar 17, 2017 10:07 AM

With universities facing greater competition and even higher student expectations, more institutions are turning to off-site solutions to expand facilities and enhance the teaching and learning experience.

Off-site construction specialist, Portakabin, has handed over a second state-of-the-art STEM laboratory scheme at the University of Cumbria – on time, on budget, and after only four months on site.

The £1.6m project on the Fusehill Campus in Carlisle has seamlessly extended laboratory facilities completed by Portakabin in 2015 using a bespoke off-site solution. The scheme has now been developed to meet the growing demand from students for degrees in a range of STEM (science, technology, engineering and maths) subjects.

The extension has allowed the university to expand its science portfolio by offering degree-level qualifications in chemistry and biomedical science.

The investment in the new specialist ‘category 2’ research facilities will help address the national skills gap for graduates with specific bioscience skills and will support the regional nuclear and pharmaceutical industries in particular. The building will also be a catalyst for greater collaboration with local schools to encourage interest in STEM subjects from an early age.

Paul McCulloch, Head of Capital Development at the University of Cumbria, said, “Following the success of the first phase, it was always our intention to expand the facilities and to use a Portakabin off-site solution again, to provide us with specialist ‘category 2’ bioscience laboratories. This would enable us to enhance our existing science curriculum offer and is a hugely exciting development for the university, our students and the regional economy.

“Our priorities were speed, quality and cost efficiency and Portakabin has excelled in each area. It has been really easy to extend the original Portakabin building vertically. We are delighted that the building was handed over on time and on budget in time for the start of the new academic year – and despite a very tight programme. By working in partnership with us, Portakabin has definitely added value to the project and their team ensured its success.”

A total of 500sqm of laboratory accommodation was craned into position in just five days and required only nine people on site. The building installation was carried out during the summer recess to avoid any disruption to the university.

Facilities include specialist research, clean and flexi-laboratories, two temperature-controlled rooms, preparation and tissue culture room, microscopy room, office, dark room and plant room.

Externally, the new upper floor has solar control feature glazing, areas of cedar cladding and brise soleil sunshading to fully integrate it with the first phase of the building.

Portakabin used an advanced off-site solution for the building and was also responsible for the installation, testing and commissioning of the air handling systems to category 2 level of containment; fume cupboards, and microbiology safety cabinets.

Featured News

Specification news
Senior specified for UK’s first carbon-neutral built...

The new Canon Medical Arena in Sheffield has been designed by architects Bond Bryan...

Read More >>

Specification news
Mapei extends coatings range with Dursilite & Mapecoat...

Mapei has introduced a series of new professional paint finishes to its Wall...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>